Age | Commit message (Expand) | Author | Files | Lines |
2012-05-23 | Change folder name from graphics/tiles to graphics/tilesets for clarity. | Alige | 1 | -0/+0 |
2012-05-14 | Correct a shade problem on some random rocks from Ground.png. | Reid | 1 | -0/+0 |
2012-05-05 | Remove Avatar sign_tileset, | Reid | 1 | -0/+0 |
2012-04-18 | Add shadow on Ground cliff and rocks. | Reid | 1 | -0/+0 |
2012-04-16 | Add concept shadow on Ground tileset, | Reid | 1 | -0/+0 |
2012-04-04 | Optimize fringe layer in 000-x maps, | Reid | 1 | -0/+0 |
2012-04-04 | Correct some mistakes on Ground.png tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Done Ground.png tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Done the rocks of Ground tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Update Ground tileset, new rocks, | Reid | 1 | -0/+0 |
2012-04-04 | Add new Water tileset, | Reid | 1 | -0/+0 |
2012-04-04 | Redo Tree_x4's first tree (top part), | Reid | 1 | -0/+0 |
2012-04-04 | Correct misswritten items.xml parts, | Reid | 1 | -0/+0 |
2012-04-04 | Update Ground tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Complet a few wips, just the stairway and a few color changes are still neede... | Reid | 1 | -0/+0 |
2012-04-04 | Redesign Ground tileset, | Reid | 1 | -0/+0 |
2012-04-04 | Add cliff-water transition and correct the color of some flowers. | Reid | 1 | -0/+0 |
2012-04-04 | Place every WIP tiles and complet some old works on Ground.png tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Update Ground.png tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Add some new tiles on Ground.png tilese. | Reid | 1 | -0/+0 |
2012-04-04 | Cliff side of the Ground.png tileset is done. | Reid | 1 | -0/+0 |
2012-04-04 | Add 10 new alternates tiles. | Reid | 1 | -0/+0 |
2012-04-04 | Done Cliff's cave entrance. | Reid | 1 | -0/+0 |
2012-04-04 | Update hairstyle #4, | Reid | 1 | -0/+0 |
2012-04-04 | Update 000-2-1 map and correct collision placement, | Reid | 1 | -0/+0 |
2012-04-04 | Change door color and continue the re-shading. | Reid | 1 | -0/+0 |
2012-04-04 | update ground tileset with new cave entrance (50% done). | Reid | 1 | -0/+0 |
2012-04-04 | Start cave's door redo. Completed the cliff in general. | Reid | 1 | -0/+0 |
2012-04-04 | Update ground tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Continue progress on Ground tileset. | Reid | 1 | -0/+0 |
2012-04-04 | Done 1/2 centered-facing-tiles and corrected left side of the cliff. | Reid | 1 | -0/+0 |
2012-04-04 | Add Ground tileset. | Reid | 1 | -0/+0 |