summaryrefslogtreecommitdiff
path: root/maps
AgeCommit message (Expand)AuthorFilesLines
2014-10-26Fix a little mistake on the city hall.Reid2-15/+23
2014-10-25Update artis.Reid1-1/+1
2014-10-25Complete the city hall entrance.Reid1-6/+6
2014-10-10Add more sit collision.Reid3-4/+4
2014-10-10Add more wall collisions.Reid1-17/+17
2014-10-06Update 001-2-8 and 001-2-9 maps.Reid2-3/+3
2014-10-05Fix some objects on 001-2-7.Reid1-3/+17
2014-10-02Fix collisions on city hall map.Reid3-11/+11
2014-09-22Add 001-2-9 (right wing of the city hall).Reid1-0/+72
2014-09-22Finalize 001-2-8's shape.Reid1-4/+4
2014-09-22Add 001-2-8 (left city hall map).Reid1-0/+72
2014-09-22Change some bench placement on Artis map.Reid1-1/+1
2014-09-21Correct collision on city hall first map.Reid1-15/+15
2014-09-21Reshape the city hall map.Reid1-0/+72
2014-09-21Advance a bit artis map.Reid1-2/+2
2014-09-12Decorate the city hall.Reid1-7/+7
2014-09-12Various fix on previous maps.Reid2-2/+2
2014-09-12Enable every layers on artis maps.Reid3-6/+6
2014-09-12Add some animated candle on the first floor of the library.Reid1-4/+5
2014-09-12Complete the second floor of the library.Reid1-8/+9
2014-09-12Fix some wip tiles on 001-2-0.Reid1-12/+12
2014-09-11Add yellow collision on 001-2-3 and 001-2-4.Reid2-2/+2
2014-09-11Add some test collision on the second floor of the library.Reid1-6/+6
2014-09-09Add fake warps on 001-x maps.Reid4-8/+45
2014-09-09Add concept map on 001-2-6.Reid1-7/+7
2014-09-09Update and polish 001-2-4 map.Reid1-6/+6
2014-09-04Add variation tiles and new books on the little room of the library.Reid1-6/+6
2014-09-02Update the library seecond floor.Reid1-21/+7
2014-09-02Update 001-2-x proprieties.Reid6-8/+32
2014-09-02Add variation tiles on 001-2-4 and purge some unused tileset.Reid1-18/+12
2014-09-02Complete the library first floor.Reid1-10/+10
2014-08-25Remove some collision tile for the door npc.Reid1-2/+2
2014-08-25Add variation on ground tiles.Reid1-10/+3
2014-08-24Add some more ground detail on 001-2-5.Reid1-22/+13
2014-08-18Fix some wrong concept tiles on 001-2-6.Reid1-1/+1
2014-08-18Complete the warehouse map.Reid1-10/+5
2014-08-17Update the warehouse and the second floor with a better shape.Reid2-5/+5
2014-08-17Add the library second floor.Reid1-0/+89
2014-08-17Update the library first floor.Reid1-2/+2
2014-08-17Activate every layers.Reid2-3/+3
2014-08-16Add new map for the library.Reid2-6/+95
2014-08-16Add new map for the library (concept).Reid1-0/+75
2014-08-16Update Artis.Reid1-2/+2
2014-08-16Add bagzie's fountain on the license and in Artis.Reid1-9/+12
2014-08-16Correct some various stuff on new maps.Reid2-5/+5
2014-08-16Update 001-2-3 to a final versionReid1-15/+18
2014-08-16Update the warp on the tmx to 001-2-3.Reid1-20/+20
2014-08-13Change bed tile on 001-2-3 and removed some wrong tiles on the chamber.Reid1-14/+14
2014-07-28Prepared the second floor size/wall/stair.Reid1-7/+7
2014-07-28Complete the first floor of 001-2-2.Reid1-5/+5