Age | Commit message (Collapse) | Author | Files | Lines | |
---|---|---|---|---|---|
2014-08-13 | Change bed tile on 001-2-3 and removed some wrong tiles on the chamber. | Reid | 1 | -14/+14 | |
2014-07-28 | Prepared the second floor size/wall/stair. | Reid | 1 | -7/+7 | |
2014-07-27 | Start to work on the second level of the same house. | Reid | 1 | -0/+78 | |